S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1500 | 1500 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 8000 | 1.8 | 14400 |
3 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 3000 | 0.3 | 900 |
4 | Collection of approved soil having CBR not less than 5, including stacking at quarry. | 3200 | 52.7 | 168640 |
5 | Transportation of metal | 3050 | 105.66 | 322263 |
6 | Transportation of metal | 2200 | 105.66 | 232452 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1 | 7000 | 7000 |
8 | Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau | 180 | 576.9 | 103842 |
9 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 1 | 7462.9 | 7462.9 |
10 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 1 | 3074.8 | 3074.8 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work | 1 | 3074 | 3074 |
12 | Cautionary, mandator, informatory, direction and place indentification signs | 1598.27 | 52.7 | 84228.829 |