State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: ROHNAI
Work Code: 1725006040/WC/22012034430515 (चेकडेम निर्माण कार्य कोटला नाला भीम के खेत पास)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2018 Work start date : 3/1/2019
Present status : Non-existent Proposed Status : Constr of Brushwood Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 201/roh Sanction Date : 28/12/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
236000 493000 0 0 0 0 0 493000 0 729000
Financial Sanction Details
Financial\Administrative Sanction No: 09/roh Financial\Administrative Sanction Date 29/12/2018
Fin. Sanc. Amt. (in Rs) NREGA:729000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
729000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil2883864
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)192.632562.8493672.164
3Plum cement concrete 1:3:6 with 75% graded metal of 40mm size and 25% plums of 150mm size.211939.840735.8
4False work for R.C.C. and P.C.C. work in plinth and foundation359.7155.856041.26
5Transportation of metal 190.416932177.6
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.129.89152.119756.269
7Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work158.58369.558595.31
8Lossening of hard soil by ploughing the existing gound85.372.7230.499
9Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed85.37504268.5
10work charge12190121901
Total Activity 729000
S.NoMaterialQuantityUnit PriceTotal
140 MM. Gitti190750142500
2Cement925285263625
3Display board120002000
4sand97.4265063323
5सेंटींग359.75820862.6
Total Material 493000