State: MADHYA PRADESH District: KATNI Block: DHIMERKHEDA Panchayat: ATRIYA
Work Code: 1744006066/RC/22012034176245 (सी0सी0 रोड निर्माण - कुंवर लाल चौधरी के घर से मोहन)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/5/2013 Work start date : 25/7/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 2004 Sanction Date : 24/6/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
65000 44000 0 0 150000 0 0 194000 0 259000
Financial Sanction Details
Financial\Administrative Sanction No: 03/66 Financial\Administrative Sanction Date 28/6/2013
Fin. Sanc. Amt. (in Rs) NREGA:259000 Panchparmeshwar
0
Scheme 2
0
Scheme 3
0
Total
259000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Double spade "v" shaped stroke 100mm deep2500.4100
2Labour only for item no.040252.25301567.5
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)48.252621.9126506.675
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)141759.924638.6
5Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used48.2593.94530.675
6False work for R.C.C. and P.C.C. work in plinth and foundation150120.218030
7Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)82.55.9486.75
8Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size14276.53871
9Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.15500055000
10Loading of metal in truck, dumper etc.1424.4341.6
11Unloading of metal in truck, dumper etc.1412.4173.6
12Loading of materials other then metal, cement and steel in truck, dumper, trolly etc.52.2521.961147.41
13Unloading of materials other then metal, cement and steel in truck, dumper, trolly etc.52.2510.98573.705
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work80.3767.85449.086
15Collection of hard moorum including stacking at quarry.52.25109.35710.925
16Labour difference in case of old SoR11068010680
Total Activity 259000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT(BEGS)37223085560
2Centring & Shuttering15071.910785
3GITTI 20 MM41.01120049212
4Gitti 40 MM12.6649.148179.164
5mixer machin (perday)2060012000
6murrom52.25101.165285.61
7sand cum27.3460016404
8STATIONARY000
9STESNORY000
10Vibrator (Per Day)203006000
Total Material 194000