State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: LALGAON
Work Code: 1713004009/IF/22012034994194 (कपिलधारा कूप निर्माण संतोष/समसेर की निजी भूमि पर )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2022 Work start date : 20/4/2022
Present status : Not Exist Proposed Status : Constr of Irrigation Open Well for Individuals
Tech Sanction Details
Technical Sanction No. : 1713004/2022-2023/115445/TS Sanction Date : 24/5/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
114935.38 78016.4 63229.99 2864.75 0 0 0 145000 0 259046.52
Financial Sanction Details
Financial\Administrative Sanction No: 1713004/2022-2023/115445/AS Financial\Administrative Sanction Date 27/5/2022
Fin. Sanc. Amt. (in Rs) NREGA:259213 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
260000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m52.0961.85294682280673221.92
2(b) C.C. 1:3:6 (1cement, 3sand, 6metal)1.9973202.633950926396395.66
3Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)0.1633947.42331288344643.43
4(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)2.4935348.1267549137613332.88
5Centering and shuttering including strutting , propping etc. and removal of form work for P.C.C. work in foundation, footing, bases for column1.633166.086956521739271.22
6(j) Cement mortar 1:6 (1cement, 6sand)11.2673937.9346764888644368.71
7(b) Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars126.5872.38189287407179162.1
8(b) Cement mortar 1:4 (1cement, 4sand)24.492159.2540421362083900.45
9(j) 5.0 Km. Lead4.208177.835076045627748.33
10(X) 5.0 Km. Lead12.09172.6542597187762087.39
11(X) 5.0 Km. Lead9198.5522222222221786.97
12(X) 5.0 Km. Lead9155.3888888888891398.5
13(XV) 10 Km. Lead7.114213.9049761034581521.72
14(XV) 10 Km. Lead0.134213.88059701492528.66
15(b) Dense or hard soil60.235159.7503112808179622.56
16(I)1.50 m. to 2.00 m.20.078216.464289271844346.17
17(II)2.00 m. to 2.50 m.20.078227.2761231198334563.25
18(XVIII)10.00 m. to 10.50 m.7.257815.313490423045916.73
19(XIX)10.50 m. to 11.00 m.7.257840.3238252721516098.23
20(XX)11.00 m. to 11.50 m.6.924865.3336221837095991.57
21(XXI)11.50 m. to 12.00 m.6.924890.3437319468516164.74
22(III)2.50 m. to 3.00 m.20.078543.46249626456810911.64
23(X)6.00 m. to 6.50 m.8.67903.0288350634377829.26
24(XI)6.50 m. to 7.00 m.8.67922.5317185697817998.35
25(XII)7.00 m. to 7.50 m.8.305942.0337146297417823.59
26(XIII)7.50 m. to 8.00 m.8.305961.536423841067985.56
27(XIV)8.00 m. to 8.50 m.7.948981.039255158537797.3
28(XV)8.50 m. to 9.00 m.7.9481000.541016607957952.3
29(XVI)9.00 m. to 9.50 m.7.5991020.043426766687751.31
30(XVII)9.50 m. to 10.00 m.7.5991039.54599289387899.51
31(IV)3.00 m. to 3.50 m.9.813803.2528278813827882.32
32(V)3.50 m. to 4.00 m.9.813819.3080607357598039.87
33(VI)4.00 m. to 4.50 m.9.424835.3629032258067872.46
34(VII)4.50 m. to 5.00 m.9.424851.417657045848023.76
35(VIII)5.00 m. to 5.50 m.9.043867.4720778502717844.55
36(IX)5.50 m. to 6.00 m.9.043883.5264845737037989.73
37Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.9172.891556.01
38Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9241.1244444444442170.12
39Citizen Information Board of size 0.6 meter x 0.9 meter ( Individual works )12313.952313.95
Total Activity 260000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.6171582885546.185007
20084-Hire charges of Diesel truck - 9 tonne (without POL)1.6579671322423717.16230546
30297-Stone Aggregate(single size): 10 mm nominal size0.56639630356.8257
40325-Blasting powder78.06976852.494097.88212232
50326-Blasting fuse (fuse wire)85.122814.511235.131828
60367-Portland Cement2.09157212551111526.65395332
70368-White cement 0.0002189157443.4463616
80983-Fine sand (zone IV)5.249955481076.255650.26458535
91005-Twisted steel/deformed bars1.3290954287214.30052
101235-Diesel oil20.80805107681414.94747276
115001-Mobil oil0.73720656182.9134.835079824
127335-Binding wire1.265855.5870.353164
137900-Modular common burnt clay bricks of class designation 7.56009.644.1324819.8132
14MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT1.35005525708.77625
15MR6007-Hier Charges for Centering2.4938001994.4
16MR6032-Snowcem/ durocem0.00041792778911.6130231
17MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)2.289416821561.37762
18MR6091-WOOD-Kail wood 2nd class0.0058321415825.692.297114784
Total Material 65200