Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:38:33 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SHYAMPUR(P)
Work Code: 1703004074/RC/22012034296021 (Kharanja Nirman Nale Ki Puliya Se Amareek singh Sardar ke Dera ki or Shyampur)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2015 Work start date : 11/1/2016
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 74/4403 Sanction Date : 15/12/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
422471 165000 0 0 0 0 0 165000 0 587471
Financial Sanction Details
Financial\Administrative Sanction No: 74/25 Financial\Administrative Sanction Date 22/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:587471 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
588000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency127974.7927974.79
2Dag-beling-Single spade stroke minimum 75mm deep8000.3240
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.1440226.1325584
4Stacking without boxing.-Puddle earth, moorum, sand or kankar33611.33796.8
5Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock.216513.66110950.56
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.270180.6348770.1
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.21644.19525.6
8Collection of soft moorum including stacking at quarry.336121.340756.8
9Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.144013.819872
10Cost of Mulching Materials including Labour Charges000
Total Activity 588000
S.NoMaterialQuantityUnit PriceTotal
1sign board150005000
2खण्‍डा परिवहन216513.66110950.56
3मुरम परिवहन (1)270180.6348770.1
Total Material 165000