S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Lime Surkhi Mortar 1:2 ( 1 lime putty, 2 surkhi,) | 0 | 0 | 0 |
2 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 195 | 0.5 | 97.5 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 51.14 | 3478.5 | 177890.49 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 145.73 | 154.2 | 22471.566 |
5 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 189 | 6.3 | 1190.7 |
6 | Collection of approved soil having CBR not less than 5, including stacking at quarry. | 41.77 | 126 | 5263.02 |
7 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 41.77 | 6 | 250.62 |
8 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 51.14 | 32 | 1636.48 |
9 | Transportation of metal | 43.47 | 214.5 | 9324.315 |
10 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms. | 21.99 | 193.05 | 4245.1695 |
11 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 11.25 | 193.05 | 2171.8125 |
12 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms. | 41.77 | 107.64 | 4496.1228 |
13 | Site clearance, cutting grass, raking into heaps and removing off the premises | 39.78 | 97.7 | 3886.506 |
14 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work | 144.07 | 97.7 | 14075.639 |