Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:45:15 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: LALGAON
Work Code: 1713004009/WC/22012034920185 (सोकपिट निर्माण ईजीएस बौडरा के पास )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2021 Work start date : 22/10/2021
Present status : Non-existent Proposed Status : Construction of Recharge Pits for Community
Tech Sanction Details
Technical Sanction No. : 1032/009/2021 Sanction Date : 25/8/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
11000 0 0 0 9000 0 0 9000 0 20000
Financial Sanction Details
Financial\Administrative Sanction No: 38/009/202 Financial\Administrative Sanction Date 22/10/2021
Fin. Sanc. Amt. (in Rs) NREGA:11000 15th Finance Commission
9000
Scheme 2
0
Scheme 3
0
Total
20000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Work charge1200200
2Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil27148.334004.91
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m2758.511579.77
4Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)1.123911.34380.656
5Transportation of metal 148004800
6Collection of quarried stone or rubble.13.5163.572208.195
7Collection of size stone for coursed rubble masonry rectangular in shape (maximum size 0.014cum to 0.06cum) including 20%headers.-Black trap Basalt or granite6.75185.381251.315
8Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.6.75228.111539.7425
Total Activity 20000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount190009000
Total Material 9000