S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil | 16.636 | 54.1 | 900.0076 |
2 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 6.0705 | 145.4 | 882.6507 |
3 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 2.416 | 809.9 | 1956.7184 |
4 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 16.569 | 940.3 | 15579.8307 |
5 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand) | 10.0543 | 1645.3 | 16542.33979 |
6 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 1 | 25374 | 25374 |