Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 06:17:08 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: MALUD
Work Code: 1725001028/IF/22012035227052 (Kapil Dhara kup nirman kary Rupshing saybu )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 26/4/2023 Work start date : 15/3/2024
Present status : Existing Proposed Status : Constr of Irrigation Open Well for Individuals
Tech Sanction Details
Technical Sanction No. : 1725001/2023-2024/57212/TS Sanction Date : 16/3/2024
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
122777.85 92663.18 66198.3 778.24 0 0 0 160000 0 282417.57
Financial Sanction Details
Financial\Administrative Sanction No: 1725001/2023-2024/57212/AS Financial\Administrative Sanction Date 16/3/2024
Fin. Sanc. Amt. (in Rs) NREGA:282597 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
283000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m57.867.00743944636683873.03
2(b) C.C. 1:3:6 (1cement, 3sand, 6metal)2.5783467.986811481778940.47
3Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)1.954408.246153846158596.08
4(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)6.1875689.6557297559435201.9
5(b) Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars330.52790.384476911114729874.51
6(XXVII) 40 Km. Lead5.966572.9450217901443418.19
7(X) 5.0 Km. Lead9215.3566666666671938.21
8(X) 5.0 Km. Lead9168.541516.86
9(XV) 10 Km. Lead2.316238.341968911917552
10(XXXI) 70 Km. Lead5.338761.2214312476584063.4
11(XV) 10 Km. Lead0.35238.34285714285783.42
12(b) Dense or hard soil60.235173.06283722088510424.44
13(I)1.50 m. to 2.00 m.20.178234.5029239766084731.8
14(II)2.00 m. to 2.50 m.20.178246.2161760333044968.15
15(XVIII)10.00 m. to 10.50 m.7.257878.5476092049066375.62
16(XIX)10.50 m. to 11.00 m.7.257905.6428276147176572.25
17(XX)11.00 m. to 11.50 m.6.924932.7368573079156458.27
18(XXI)11.50 m. to 12.00 m.6.924959.8310225303296645.87
19(III)2.50 m. to 3.00 m.20.178584.04301714738811784.82
20(X)6.00 m. to 6.50 m.8.67978.3206459054218482.04
21(XI)6.50 m. to 7.00 m.8.67999.4475201845448665.21
22(XII)7.00 m. to 7.50 m.8.3051020.575556893448475.88
23(XIII)7.50 m. to 8.00 m.8.3051041.703792895858651.35
24(XIV)8.00 m. to 8.50 m.7.9481062.830900855568447.38
25(XV)8.50 m. to 9.00 m.7.9481083.958228485158615.3
26(XVI)9.00 m. to 9.50 m.7.5991105.086195552058397.55
27(XVII)9.50 m. to 10.00 m.7.5991126.21397552318558.1
28(IV)3.00 m. to 3.50 m.9.813870.2292876796098539.56
29(V)3.50 m. to 4.00 m.9.813887.6215224701938710.23
30(VI)4.00 m. to 4.50 m.9.424905.0148556876068528.86
31(VII)4.50 m. to 5.00 m.9.424922.4076825127348692.77
32(VIII)5.00 m. to 5.50 m.9.043939.799845184128498.61
33(IX)5.50 m. to 6.00 m.9.043957.1923034391248655.89
34Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.9187.2977777777781685.68
35Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9261.2177777777782350.96
36Citizen Information Board of size 0.6 meter x 0.9 meter ( Individual works )12622.392622.39
Total Activity 283000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper1.084236510001084.2365
20084-Hire charges of Diesel truck - 9 tonne (without POL)1.9773546521004152.444765
30297-Stone Aggregate(single size): 10 mm nominal size1.575646501024.166
40325-Blasting powder78.069768564371.907008
50326-Blasting fuse (fuse wire)85.1228282383.4384
60367-Portland Cement3.2414463640020745.25632
70368-White cement 0.0002189156263.4205314
80983-Fine sand (zone IV)5.012271110255137.5778775
91005-Twisted steel/deformed bars3.4705335690023946.68115
101235-Diesel oil40.752177031004075.217703
115001-Mobil oil1.4547404270392.779908
127335-Binding wire3.3052760198.3162
137900-Modular common burnt clay bricks of class designation 7.5150.85.2784.16
14MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT1.7277500863.85
15MR6007-Hier Charges for Centering6.1876784194.786
16MR6032-Snowcem/ durocem0.00041792600010.8654
17MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)6.226217904918.7059
Total Material 78300