S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 89.1 | 145.4 | 12955.14 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 57.75 | 2343.8 | 135354.45 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 57.75 | 3234.3 | 186780.825 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 67.7 | 126.2 | 8543.74 |
5 | Stacking without boxing.-Puddle earth, moorum, sand or kankar | 89.1 | 390.36 | 34781.076 |
6 | Transportation of metal | 51.98 | 440.4 | 22891.992 |
7 | Transportation of 20 MM metal | 49.09 | 440.4 | 21619.236 |
8 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Loose or soft soil | 627 | 10.2 | 6395.4 |
9 | Providing and fixing laboratory sink with C.I. or M.S. brackets painted white including cutting holes in walls and making good the same but excluding fitting.-Glazed Earthenware 450 mm x 300 mm x 150 mm size | 17.5 | 90.3 | 1580.25 |
10 | SIGN BOARD | 0 | 0 | 0 |
11 | transportion of sand | 50.82 | 758.16 | 38529.6912 |
12 | contingency | 1 | 13000 | 13000 |
13 | TRANSPOTATION OF CEMENT | 21.6 | 259.58 | 5606.928 |