State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: PRATAPPURA
Work Code: 1702001079/RC/22012034530567 (Khet Sadak Nirman Ater Marg Se Badpuri Ki Or, Pratappura)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 3/6/2020 Work start date : 16/7/2020
Present status : No Road Proposed Status : Construction of Gravel Road Roads for Community
Tech Sanction Details
Technical Sanction No. : 1702001/2020-2021/287531/TS Sanction Date : 19/8/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
130994.17 2356994.88 153.04 6065.27 0 0 0 2364000 0 2494207.36
Financial Sanction Details
Financial\Administrative Sanction No: 1702001/2020-2021/287531/AS Financial\Administrative Sanction Date 27/8/2020
Fin. Sanc. Amt. (in Rs) NREGA:2494199 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
2495000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complet compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete.204019.11256862745138989.64
2(b) Above item having material strength not less than 30%CBR2023547.912516065251108427.02
3"Construction of Gravel Surface Course as per clause 402 of "Ministry of Rural Development, Specifications for Rural Roads-August, 2004" by an appropriate combination of natural gravel, river borne material and crushed metal in required proportions confirming to Grading requirements specified in clause 2.2.2.2 or clause 2.2.2.3 (Table 2.3, Material having Nominal Maximum Size 20 mm or 10 mm) of IRC:SP:77-2008, having Liquid Limit less than 40 and Plasticity Index 6-15 and strength of material not less than 20% CBR, including all leads and lifts of material etc. complete. The mixing shall be by Mix-in-Place method over prepared surface, spreading in uniform layers with tractor mounted grader or manually, watering at OMC and compaction by smooth wheeled/vibratory roller of 80 to 100 kN static weight to achieve 100% of MDD as per IS:2720 (Part-7)".476468.318928571429222919.81
4Excavation, Carting i/c Removal of Soil with Disposal upto 1000 m Excavation of embankment, sub-grade and drain consisting of excavation, removal and satisfactory disposal of all excavated materials including hauling to sides of embankment and subgrade construction as also the disposal of materials in specified manner and the trimming and finishing of the road to the specified dimensions i/c all lifts, lead upto 1000 meters including dewatering, shaping and excavation in marsh and complete disposal of all muck as per clause 302. for all types of soil i/c moorum gravel etc. as directed by the Engineer-in-charge6725.250.4824986617498339504.9
5Construction of Embankment, subgrade & earthen shoulders with Material Obtained from Borrow Pits. Construction of embankment, subgrade & earthen shoulders with approved material (Select soil having CBR 7) obtained from borrow pits i/c all leads and lift and removal of top soil if any, including cost of land as a source of material, transporting to site, spreading, graded by motor grader to required slope and compacting using vibratory rollers of 80 to 100 kN static weight to meet requirement of Tables 300.1 and 300.2 including all leads, etc. as per Technical Specification Clauses 301.4, 301.5, and 303.4080181.840617647059741909.72
6(C) 800 mm x 600 mm rectangular13544.613544.61
7(A) With Reinforced cement concrete (ii) Ordinary Kilometer Stone (Pre cast)21601.3953202.79
8Site clearance, cutting grass, raking into heaps and removing off the premises136002.6254580882352935706.23
Total Activity 2495000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.066588558.8525
20038-Tractor with ripper attachment15.3969212432703.0156
30054-Vibratory roller 8 to 10 tonne40.894438515.2
40055-Smooth Wheeled Roller 8 to 10 tonne279.07223665860.992
50057-Water Tanker 5 to 6 KL Capacity82.451189729.1
60295-Stone Aggregate(single size):20 mm nominal size485.52797.44387173.0688
70296-Stone Aggregate(single size): 12.5 mm nominal size109.48797.4487303.7312
80297-Stone Aggregate(single size): 10 mm nominal size0.073163046.053
90367-Portland Cement0.219355111208.5623
100830-Enamel paint0.5379160.1386.133927
110983-Fine sand (zone IV)0.29911076.25321.906375
121005-Twisted steel/deformed bars0.0455428244.26
131007-Structural steel such as tees, angles, channels and R.S. joists 0.14164956701.7696
147335-Binding wire0.042955.582.384382
15MR11672-Suport MS sheet tubes 47 mm X 47 mm X 12 SWG sheet 3050 mm long12.458719.2
16MR11673-2 mm thick MS sheet strengthened by 25 mm X 5 mm M.S. flat iron and painted with stove enameled paint including lettering, signs, messages, border with reflective tape of engineering grade of required size, shade and colour as per MORD specifications.0.4821141014.72
17MR11674-Tractor with Trolley0.0837029.6
18MR11675-PaintingM.S tube posts with primer and two coats of epoxy paint as per specification As per item No.10.4 of chapter 100.8996.8786.2143
19MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.3456525181.44
20MR6039-Water9843000.0549215
21MR6051-Tractor with rotavator99.9621020991.6
22MR6052-Hard moorum437.9218982766.88
23MR6056-Well Graded granular material (For Gravel Road)1942.08246.19478120.6752
24MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.146268299.7084
25MR6188-Tipper (Capacity 5.50 Cum)773.8967560.5433769.10035
26MR6189-Dozer D-50 for Spreading20.4230146940.4
27MR6190-Motor Grader for Spreading20.4247850551.2
28MR6191-Water Tanker 5 to 6KL81.61189628.8
29MR6192-Hydraulic Excavator (Capacity : 0.90/1.0 cum Bucket) including POL135.3882006271588.328
Total Material 2070000