Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:25:48 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: KERBANA
Work Code: 1711003040/LD/3799410797 (मुक्तिधाम निर्माण कार्य ग्राम केरबना)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 2/10/2011 Work start date : 10/10/2013
Present status : Not Exist Proposed Status : Development of Waste Land
Tech Sanction Details
Technical Sanction No. : 1125/1/ Sanction Date : 17/11/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
260754 100246 0 0 0 0 0 101000 0 361000
Financial Sanction Details
Financial\Administrative Sanction No: 1125/2/ Financial\Administrative Sanction Date 18/11/2011
Fin. Sanc. Amt. (in Rs) NREGA:361000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
361000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Site clearance, cutting grass, raking into heaps and removing off the premises20001.53000
3Contingency150005000
4Work charge18851588515
5Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil000
6Dag-beling-Single spade stroke minimum 75mm deep399.120.279.824
7TRANSPORTATION OF MATERIAL478.94172.1582449.521
8Collection of quarried stone or rubble.-Maximum size 0.014 cum478.94110.652970.764
9Labour only for item 2310478.94236.6113317.204
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Tank Work96252400
11Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil11589.610304
Total Activity 361000
S.NoMaterialQuantityUnit PriceTotal
1Bolder478.94172.1582449.521
2contengency170007000
3Fartilizer (Gobar Khad)4802960
4mason perday000
5Plant115505750
6singboard120002000
7गोबर खाद96021920
Total Material 101000