Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 05:35:23 AM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: GUDIKHEDA RAIYAT
Work Code: 1725007032/IC/22012034882517 (सार्वजनिक पेयजल कूप निर्माण चेक डेम के पास देवझिरी )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2022 Work start date : 25/1/2023
Present status : Not Exist Proposed Status : Construction of Irrigation Open Well for Community
Tech Sanction Details
Technical Sanction No. : 1725007/2022-2023/10906/TS Sanction Date : 23/1/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
191390.15 215122.98 110118.82 4082.93 0 0 0 330000 0 520714.88
Financial Sanction Details
Financial\Administrative Sanction No: 1725007/2022-2023/10906/AS Financial\Administrative Sanction Date 30/1/2023
Fin. Sanc. Amt. (in Rs) NREGA:520715 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
521000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Hard rock requiring blasting12.564582.9305953517997323.94
2Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like.14067.229410.8
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m87.80761.8530413292795431.13
4Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)8.0754366.8941176470635262.67
5(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)19.2415631.98482407359108365.02
6Brick bat filling in trenches or soak pits.6.75333.2355555555562249.34
7Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height100106.576210657.62
8(b) Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars665.52990.168347284641260009.65
940mm cement concrete flooring with 25mm under layer of cement concrete 1:3:6 (1cement, 3sand, 6stone aggregate of size 12.5mm and below) and 15mm wearing (1cement, 2 to 3 stone aggregate of size 4.75mm and below) laid in interval with base course and finished with a floating coat of neat cement.31.32352.99265644955311055.73
10(b) Dense or hard soil75.36159.75039808917212038.79
11(I)1.50 m. to 2.00 m.25.12526.61703821656113228.62
12(XVIII)10.00 m. to 10.50 m.11.873830.5769392739839861.44
13(XIX)10.50 m. to 11.00 m.11.873855.58746736292410158.39
14(II)2.00 m. to 2.50 m.25.12542.67197452229313631.92
15(XX)11.00 m. to 11.50 m.11.873880.59799545186610455.34
16(XXI)11.50 m. to 12.00 m.11.873905.60852354080710752.29
17(III)2.50 m. to 3.00 m.25.12558.72691082802514035.22
18(IV)3.00 m. to 3.50 m.22.078574.78168312347112690.03
19(V)3.50 m. to 4.00 m.22.078590.83657940030813044.49
20(VI)4.00 m. to 4.50 m.22.078606.89102273756713398.94
21(VII)4.50 m. to 5.00 m.19.233622.94597826652111981.12
22(VIII)5.00 m. to 5.50 m.19.233639.00067592159312289.9
23(IX)5.50 m. to 6.00 m.19.233655.05537357666512598.68
24(X)6.00 m. to 6.50 m.11.873940.16592268171511162.59
25(XI)6.50 m. to 7.00 m.11.873959.6681546365711394.14
26(XII)7.00 m. to 7.50 m.11.873979.17038659142611625.69
27(XIII)7.50 m. to 8.00 m.11.873998.67261854628211857.24
28(XIV)8.00 m. to 8.50 m.11.8731018.1748505011412088.79
29(XV)8.50 m. to 9.00 m.11.8731037.6779247031112320.35
30(XVI)9.00 m. to 9.50 m.11.8731057.1801566579612551.9
31(XVII)9.50 m. to 10.00 m.11.8731076.6823886128212783.45
Total Activity 516000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper2.731610002731.6
20011-Hire charges of Pump set of capacity 4000 litres/hour4.876260315002438.130155
30295-Stone Aggregate(single size):20 mm nominal size0.56376750422.82
40297-Stone Aggregate(single size): 10 mm nominal size5.309196503450.9735
50325-Blasting powder69.045816563866.565696
60326-Blasting fuse (fuse wire)75.2836282107.9408
70367-Portland Cement9.32299640059667.136
80982-Coarse sand (zone III)0.37584979.2368.022528
90983-Fine sand (zone IV)12.2922102512599.505
101004-Average rate of mild steel round bars for reinforcements0.385321164002466.05504
111005-Twisted steel/deformed bars6.9880545690048217.57605
121008-Flats up to 10 mm in thickness0.6880733965004472.477035
131215-Welding by electric plant275.22935781275.2293578
142903-Stone chippings/ screenings 4.75 mm nominla size0.4698490230.202
153-Display Board / CIB150005000
167335-Binding wire6.6552960399.3174
17MR6007-Hier Charges for Centering19.24167813045.398
18MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)18.8669779014904.9063
19MR6094-Brick aggregate 50 MM nominal size cubic metre6.752001350
Total Material 179000