Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:11:50 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: RITHODAN(P)
Work Code: 1703004071/RS/22012035125121 (WATER CHENAL NIRMAN RAJJAN PARMAN K KHET SE DEVISINGH PARIHAR K KHET KI OR)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 26/1/2024 Work start date : 5/3/2024
Present status : Not Exist Proposed Status : Constr of Open/Covered Grey Water Drain for Comm
Tech Sanction Details
Technical Sanction No. : 1703004/2023-2024/32410/TS Sanction Date : 5/3/2024
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
530466.11 229044.48 0 166551 0 0 0 396000 0 926061.59
Financial Sanction Details
Financial\Administrative Sanction No: 1703004/2023-2024/32410/AS Financial\Administrative Sanction Date 6/3/2024
Fin. Sanc. Amt. (in Rs) NREGA:926062 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
927000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.11007.609318181818188370.25
2Mud Mortar103.95439.14468494468545649.09
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m12067.00741666666678040.89
4Filling foundation, around masonry work, plinth, sides of foundation etc. with moorum I/c ramming layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m.198272.56742424242453968.35
5Labour only for random/ uncoursed rubble masonry in any. Mortar for item no.0506 excluding labour for preparation of mortar.247.5996.143757575757246545.58
6(a) Flush pointing1650121.432315151515200363.32
7Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite.247.5760.410909090909188201.7
8(c) Masonry stones, pitching stones or boulders247.550.570343434343412516.16
9(X) 5.0 Km. Lead247.5262.17373737373764888
10(b) Dense or hard soil550169.85309090909193419.2
Total Activity 922000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.1651000165
20084-Hire charges of Diesel truck - 9 tonne (without POL)13.34745763210028029.661023
30367-Portland Cement1.25464008025.6
40810-Moorum19818035640
50983-Fine sand (zone IV)3.53110253619.275
61235-Diesel oil154.697033910015469.70339
73-Display Board / CIB141004100
85001-Mobil oil5.472457632701477.5635601
9MR6034-Blaster (Semi-Skilled)2.475392970.2
10MR6035-Gelatine (80%)47.025843950.1
11MR6036-Electric detonator247.5348415
12MR6037-Fuse coil (10m long)74.25201485
13MR6038-Drilling of holes 25mm dia 0.75m deep185.6257012993.75
Total Material 125000