S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1912.5 | 7.02398431372549 | 13433.37 |
2 | Providing stone chips under stone pitching | 337.5 | 608.102725925926 | 205234.67 |
3 | (a) Other then black trap Basalt or granite | 191.7 | 350.6616066771 | 67221.83 |
4 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 2903.85 | 2.52450023245002 | 7330.77 |
5 | (III) 1.5 Km. Lead | 1126.912 | 107.795275939914 | 121475.79 |
6 | (VIII) 4.0 Km. Lead | 1776.938 | 148.868908200511 | 264530.82 |
7 | (a) Boulders | 168.75 | 897.525096296296 | 151457.36 |
8 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 170.1 | 452.889770723104 | 77036.55 |
9 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 2903.85 | 22.9305611515746 | 66586.91 |
10 | b (iii) Dense or hard soil for Tank Work | 1000.012 | 144.075001099987 | 144076.73 |
11 | c (iii) Hard moorum for Tank Work | 1776.938 | 191.90789999426 | 341008.44 |
12 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 56.25 | 611.771733333333 | 34412.16 |