S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil | 27 | 148.33 | 4004.91 |
2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 27 | 58.51 | 1579.77 |
3 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 1.12 | 3911.27 | 4380.6224 |
4 | Transportation of metal | 1 | 4800 | 4800 |
5 | Collection of quarried stone or rubble. | 13.5 | 163.57 | 2208.195 |
6 | Collection of size stone for coursed rubble masonry rectangular in shape (maximum size 0.014cum to 0.06cum) including 20%headers.-Black trap Basalt or granite | 6.75 | 185.38 | 1251.315 |
7 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 6.75 | 228.11 | 1539.7425 |