S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Cutting down trees (exceeding 30cm girth, grubbing uproot, filling pits and levelling off ground, lopping branches, trimming, removing not exceeding 50meter & staking serviceable material and cleaning site.-Girth exceeding 100 cm and not exceeding 150 cm | 0 | 0 | 0 |
2 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 1740.38 | 10.7 | 18622.066 |
3 | Providing and laying in foundation, plinth and under floors lime concrete with 40mm nominal size graded stone aggregates (metal) and 40% lime mortar. i/c ramming in layers and curing complete excluding cost of form work.-Lime mortar 1:2 (1lime putty, 2sand) | 4.1 | 5000 | 20500 |
4 | 22cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth. | 111 | 260.4 | 28904.4 |
5 | Lossening of hard soil by ploughing the existing gound | 3813.75 | 2.7 | 10297.125 |
6 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 3813.75 | 50 | 190687.5 |