S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 45 | 76.9 | 3460.5 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:5:10 (1 cement, 5sand, 10metal) | 11.25 | 1960.9 | 22060.125 |
3 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 105 | 1079 | 113295 |
4 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 180 | 52.6 | 9468 |
5 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing | 320 | 70 | 22400 |
6 | Collection of size stone for coursed rubble masonry rectangular in shape (maximum size 0.014cum to 0.06cum) including 20%headers.-Other then black trap Basalt or granite | 105 | 211.4 | 22197 |
7 | Transportation of metal | 4.46 | 253.7 | 1131.502 |
8 | Transportation of sand | 105 | 157.2 | 16506 |
9 | Transportation rates for Masonry stone. | 8.74 | 704.79 | 6159.8646 |
10 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 10.57 | 136.7 | 1444.919 |
11 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 2.35 | 400.77 | 941.8095 |
12 | contingency | 1 | 19435.2799 | 19435.2799 |