S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Setting out work Refferance pillers, refferancing bench mark and temporary bench mark Construction of Reference Bench Mark 50x50x70 cm. made of 1:3:6 cement concrete i/c excavation of 50x50x50 cm pit, working benchmark 30x30x45 cm at every 500 m interva | 62.5 | 4548 | 284250 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 16.5 | 3245 | 53542.5 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 12 | 2721 | 32652 |
5 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 280 | 9.77 | 2735.6 |
6 | Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural | 19 | 499.18 | 9484.42 |
7 | Lossening of hard soil by ploughing the existing gound | 270 | 53.1 | 14337 |