State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: SEMALYA RAIYAT
Work Code: 1725007069/IF/9926703274 (कपिलधारा कुप निर्माण श्रीराम पिता कालूराम ग्राम पं)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/2/2014 Work start date : 5/2/2014
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 1786@@ Sanction Date : 7/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
141000 94000 0 0 0 0 0 94000 0 235000
Financial Sanction Details
Financial\Administrative Sanction No: 39@@ Financial\Administrative Sanction Date 9/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:235000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
235000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil4.581.2365.4
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum997.7879.3
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)9234.32108.7
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting4.5302.81362.6
5Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Dense or hard soil70.3189.66299.776
6Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Hard moorum70.3191.36419.303
7Dag-beling-Single spade stroke minimum 75mm deep6000.2120
8Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead70.3121.91539.789
9Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.176.11526.6692750.0926
10Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)98.28344.0833816.1824
11work charge18900089000
Total Activity 235000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL610006000
2Binding wire1060600
3Blasting (No)35010035000
4Board120002000
5Cement4030012000
6Centering and Shuttering118.4410011844
7desal pump rent126007200
8MASON (PERDAY)123003600
9P V C PIPE 22025500
10Photo copy2532506
11Photograph1025250
12sand (t)310003000
13STEEL2005010000
14Transpotation Charges35001500
Total Material 94000