S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 0 | 0 | 0 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited) | 0 | 0 | 0 |
3 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Dense or hard soil | 0 | 0 | 0 |
4 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Hard moorum | 1 | 57000 | 57000 |
5 | Collection of staking materials with staking charges | 0 | 0 | 0 |