S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 1683.3 | 45.2 | 76085.16 |
2 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms. | 16.17 | 166.06 | 2685.1902 |
3 | FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders | 19.3 | 632.6 | 12209.18 |
4 | Lossening of hard soil by ploughing the existing gound | 3681.6 | 2.7 | 9940.32 |
5 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 3681.6 | 50 | 184080 |
6 | Field Technical Supervisior Charge-FTSC | 1 | 3000 | 3000 |