S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 8.4 | 117.5 | 987 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 9.23 | 155.8 | 1438.034 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting) | 2.42 | 369.5 | 894.19 |
4 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 8.58 | 118.8 | 1019.304 |
5 | Extra for making cheques of approved pattern on cement concrete floors, steps, landing, pavement etc. | 1 | 500 | 500 |
6 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 8.58 | 149.6 | 1283.568 |
7 | Stacking without boxing.-Masonry stones, pitching stones or boulders | 8.58 | 48.9 | 419.562 |
8 | Labour only for boulder soling hand packed excluding consolidation. | 8.58 | 192 | 1647.36 |
9 | work charge | 1 | 409 | 409 |