S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Lime Mortar 1:3 ( 1 lime putty, 3sand ) | 0 | 0 | 0 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:5:10 (1 cement, 5sand, 10metal) | 0.8 | 1776.5 | 1421.2 |
3 | Labour only for item no. 0413 (for any proportion of cement concrete) | 0.8 | 427.5 | 342 |
4 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size) | 3.81 | 3028.3 | 11537.823 |
5 | Labour only for item 0425. | 3.81 | 589.6 | 2246.376 |
6 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 22.56 | 140.1 | 3160.656 |
7 | Labour only for item no. 0428. | 22.56 | 92.9 | 2095.824 |
8 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:5 (1cement, 5sand) | 5.04 | 2492.7 | 12563.208 |
9 | Labour only for brick masonry in plinth and foundation I/c making mortar for item no.0605 | 5.04 | 504.3 | 2541.672 |
10 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars | 300.07 | 52.9 | 15873.703 |
11 | Labour only for item no.0904 | 300.07 | 4.8 | 1440.336 |
12 | Transportation of metal | 1587.5 | 46.53 | 73866.375 |
13 | Loading of metal in truck, dumper etc. | 1587.5 | 29.26 | 46450.25 |
14 | Unloading of metal in truck, dumper etc. | 1587.5 | 13.67 | 21701.125 |
15 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 1587.5 | 44.7 | 70961.25 |
16 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia. | 5 | 3849.2 | 19246 |
17 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 1587.5 | 32.3 | 51276.25 |
18 | Site clearance, cutting grass, raking into heaps and removing off the premises | 750 | 1.8 | 1350 |
19 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 312 | 96.2 | 30014.4 |
20 | Collection of soft moorum including stacking at quarry. | 1587.5 | 122.8 | 194945 |
21 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil. | 1900 | 14 | 26600 |
22 | contingency | 1 | 17688 | 17688 |