S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1200 | 1.6 | 1920 |
2 | Work charge | 70 | 49.7 | 3479 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 223.1 | 176.1 | 39287.91 |
4 | Transportation of metal | 120 | 82.93 | 9951.6 |
5 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting) lift from 1.50 m. to 2.00 m. | 720 | 30 | 21600 |
6 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 720 | 67.8 | 48816 |
7 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work | 205 | 80 | 16400 |
8 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Hard moorum | 136.5 | 250.1 | 34138.65 |
9 | SIGN BOARD | 1 | 1500 | 1500 |
10 | contingency | 1 | 23000 | 23000 |