State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: PATAI
Work Code: 1713004007/RC/22012034214134 (Ts no 1965 खेत सडक दशपुर्वा मुख्‍यसडक से राजबहोर ग)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2013 Work start date : 15/3/2014
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1965/07 Sanction Date : 20/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
521000 346000 0 0 0 0 0 346000 0 867000
Financial Sanction Details
Financial\Administrative Sanction No: 09/07 Financial\Administrative Sanction Date 23/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:867000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
867000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard000
2Survey & Investigation7.27200014540
3Site clearance, cutting grass, raking into heaps and removing off the premises84201.613472
4Dag-beling-Single spade stroke minimum 75mm deep19000.2380
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)12.062343.828266.228
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)1.53400.45100.6
7Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)11500015000
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 3766.5622599
9Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.5.06255.326.83125
10Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.488.5259.56126795.06
11Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.7.129440.43139.6116
12Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.39.1575616.5624142.9482
13Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.2.723273.96745.99308
14Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN54032.817712
15Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-450mm dia9512.64613.4
16Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.37.53476130350
17Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1741.521.537442.25
18Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact128526.233667
19Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)148.539.65880.6
20Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work522.4581.242422.94
21Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil47.5888.34201.314
22Collection of puddle earth including stacking at quarry2179.55112.8245853.24
23Collection of hard moorum including stacking at quarry.688.5130.890055.8
Total Activity 867000
S.NoMaterialQuantityUnit PriceTotal
1Moorum5.0253501758.75
2roller 8 to 101741.521.537442.25
3Rolling Earth & moorum54032.817712
4Transportanion of Soft Muram628.5350219975
5Transportation of embankment s979.5563.2761976.1285
6Transportation of Water1066.566399
Total Material 346000