S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 500 | 500 |
2 | Contingency | 1 | 5000 | 5000 |
3 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 59.1 | 0 | 0 |
4 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 58.8 | 0 | 0 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 64.4 | 3089.9 | 198989.56 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 58.8 | 2404.1 | 141361.08 |
7 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 64.4 | 169.4 | 10909.36 |
8 | False work for R.C.C. and P.C.C. work in plinth and foundation | 168.8 | 164.1 | 27700.08 |
9 | TRANSPORTATION OF MATERIAL | 1 | 76727 | 76727 |
10 | Transportation of sand | 30.2 | 0 | 0 |
11 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil. | 409 | 11.6 | 4744.4 |
12 | Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-2 (Size ranging from 63 mm to 45 mm) | 51.6 | 376 | 19401.6 |