State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: PIPARHA
Work Code: 1713004013/AV/1212 (Aanganbadi Bhavan Nirman Sewa Kendra,GANGEV)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 2/10/2013 Work start date : 10/3/2014
Present status : NEW Proposed Status : AWC
Tech Sanction Details
Technical Sanction No. : 1796 Sanction Date : 28/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
111000 658000 0 0 0 0 0 658000 0 769000
Financial Sanction Details
Financial\Administrative Sanction No: 100 Financial\Administrative Sanction Date 28/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:769000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
769000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m18.6435.8667.312
2Filling foundation and around masonry work with moorum I/c ramming layers and watering.15.088145.42193.7952
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)0.4083234.31319.5944
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)13.1172343.830743.6246
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)27.2853823.3104318.7405
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)10.5643823.340389.3412
7False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift131.49163.921551.211
8False work for R.C.C. and P.C.C. work in plinth and foundation118.618126.214969.5916
9Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:4 (1cement, 4sand)1.82875.45175.72
10Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:5 (1cement, 5sand)15.7942840.644864.4364
11Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)2.3882720.36496.0764
12Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height84059.449896
13Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars2307.64551.1117920.6595
1415mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand)898.5788
1515mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)339.7985.829153.982
16White glazed tiles 6mm thick in flooring, treads of steps and landings laid on a bed of 12mm thick cement mortar 1:3 finished with flush pointing in white cement.8.7622.55415.75
17Kota stone slab flooring over 20mm thick base of C.M. 1:6 laid over and jointed with grey cement slurry mixed with pigment to match the shade of slab including grinding, rubbing & polishing etc. complete. (Area of each stone should not be less than 0.20 S-40 mm thick.56.054987.355342.1142
18White washing whith lime on undecorated wall surfaces (3coats) to give an even shade including thoroughly broomed the surface to remove all dirt, dust, mortar drops and other foreign matter.399.578.83516.216
19Snowcem or durocem painting of any shade-2 coats on new work98.91512.11196.8715
20Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-3 coats28.004100.32808.8012
21Transportation of metal 50.221440.422117.3284
22Transportation of metal 14.058440.46191.1432
23Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti45.01197.64393.0736
24SIGN BOARD125002500
25work charge11500015000
26transportion of sand18.928758.1614350.45248
27contingency14532045320
28TRANSPOTATION OF CEMENT7.803223.561744.43868
29Electrification of RGSK15000050000
30Internal Water supply ans sanitary fitting16800068000
Total Activity 769000
S.NoMaterialQuantityUnit PriceTotal
120 MM METAL14.058125017572.5
240 mm Metal11.315120013578
3Bricks62313.723054.7
4CEMENT(BEGS)11127029970
5Convergence Amount1500000500000
6iron bar1313.8974356497.571
7Sand (mortar)10.12170017204
Total Material 658000