S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1950 | 3.4 | 6630 |
2 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 1287 | 9 | 11583 |
3 | Transportation of sand | 1287 | 136.82 | 176087.34 |
4 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 1287 | 19.7 | 25353.9 |
5 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia. | 15 | 2395.1 | 35926.5 |
6 | Fixing 12.5 litres low and high level flushing cistern with a pair of C.I. Or M.S. brackets complete with fittings each as lead valve loss syphon. 15mm nominal size brass ball valve with polythene float, C.P. brass handle, unions and couplings for connect-Vitreous China white colour low level | 2080 | 8.2 | 17056 |
7 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 1521 | 67.8 | 103123.8 |
8 | Collection of soft moorum including stacking at quarry. | 1287 | 94.2 | 121235.4 |