S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 4000 | 4.2168 | 16867.2 |
2 | Hard/ Dense Soil: | 2932.5 | 91.8032497868713 | 269213.03 |
3 | 40 mm stone aggregate: | 46.051 | 1343.86006818527 | 61886.1 |
4 | Spreading & levelling to gradient & required camber shingle/gravel without power roller: | 45.9 | 92.677559912854 | 4253.9 |