State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: DHAUDHKI
Work Code: 1713004045/RC/22012034209020 (खेंतसडक राजेन्‍द्र पटेल से राजघर के घर तक Ts 1659 )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2013 Work start date : 20/2/2014
Present status : No Road Proposed Status : Bitumen Top
Tech Sanction Details
Technical Sanction No. : 1659/45 Sanction Date : 10/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
251000 174000 0 0 0 0 0 174000 0 425000
Financial Sanction Details
Financial\Administrative Sanction No: 58/45 Financial\Administrative Sanction Date 26/1/2014
Fin. Sanc. Amt. (in Rs) NREGA:425000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
425000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard11012110121
2Site clearance, cutting grass, raking into heaps and removing off the premises21601.63456
3Contingency11430014300
4Dag-beling-Single spade stroke minimum 75mm deep9000.2180
5Transportation of metal 855.93102.6987895.4517
6Transportation of metal 000
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.176.13295.5652056.9828
8Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia10964.49644
9Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making611.8221.513154.13
10Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor550.022312650.46
11Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)176.1339.66974.748
12Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:46.35578.326804.205
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work305.9181.224839.892
14Collection of puddle earth including stacking at quarry893.01112.8100731.528
15Collection of hard moorum including stacking at quarry.139.05130.818187.74
16Labour difference in case of old SoR30014643800
Total Activity 425000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work611.8216.810278.576
2Compaction of GSB176.113234050.599
3Compaction of Selected soil550.0219.810890.396
4contangency and work charges150005000
5Display board150005000
6Gravel or moorum36.35391.4814230.298
7HumePipes11600016000
8soil transportation893.0163.2756500.7427
9Tran. water lead1337.974.56020.865
10transportation of hard muram 1176.13256.1445113.9382
Total Material 174000