S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Single spade stroke minimum 75mm deep | 100 | 0.5 | 50 |
2 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 45 | 94.4 | 4248 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 48 | 2592.6 | 124444.8 |
4 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 70 | 3564.1 | 249487 |
5 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 45 | 44.1 | 1984.5 |
6 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 60 | 87.3 | 5238 |
7 | Collection of hard moorum including stacking at quarry. | 45 | 140.7 | 6331.5 |