State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: KISUPURA
Work Code: 1702001014/OP/9425888888 (Cattle protection wall govt. H S Schools Kishupura)
Work Category: Other Works
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 26/1/2016 Work start date : 12/2/2016
Present status : Existing Proposed Status : Production of building material
Tech Sanction Details
Technical Sanction No. : 2772 Sanction Date : 28/1/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
260000 728000 0 0 0 0 0 728000 0 988000
Financial Sanction Details
Financial\Administrative Sanction No: 65/2772 Financial\Administrative Sanction Date 1/2/2016
Fin. Sanc. Amt. (in Rs) NREGA:988000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
988000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m129.6395054.4
3Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.16.288214288.4
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)2.163194.26899.472
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)42.93320.2142436.58
6False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift140.2195.427395.08
7False work for R.C.C. and P.C.C. work in plinth and foundation196.36132.526017.7
8Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)82.311901.1156479.541
9Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)77.832849.4221768.802
10Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height383.4465.225000.288
11Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars2357.3550.8119753.38
1215mm thick cement plaster on rough side of wall in-Cement mortar 1:5 (1cement, 5sand)676.8499.467277.896
13Colour washing 2 coats over and including a primary coat of white washing on undecorated wall surface.1066.5610.310985.568
14Broken glass coping as specified on top of walls in cement mortar 1:319942.78497.3
15Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1101000101000
16Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil16296.215584.4
17contingency13703737037
Total Activity 988000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. B.T. METAL54.5150081750
2Bajari6.483001944
3Brick385004.2161700
4CEMENT (BEGS)590280165200
5Centering and Shuttering3358829480
6Colour1008800
7contangency and work charges150005000
8HAIGHER CHARGES OF MIXER2080016000
9Lime Powder1504600
10send82.481400115472
11Steel Bars23604094400
12Steel Gate4256025500
13Tansportation of water110404400
14Transpotation Charges 212500025000