State: MADHYA PRADESH District: REWA Block: NAIGARHI Panchayat: KORIGAWAN
Work Code: 1713007062/RC/22012034205900 (Ts. 1522 Khet Sadak Yojna Abhay Raj Patel Ke Dukan)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 28/1/2014 Work start date : 11/2/2014
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 62/100/1522 Sanction Date : 28/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
543400 362200 0 0 176400 0 0 539000 0 1082000
Financial Sanction Details
Financial\Administrative Sanction No: 62/100/28 Financial\Administrative Sanction Date 11/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:1082000 Panchparmeshwar
0
Scheme 2
0
Scheme 3
0
Total
1082000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard000
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.57601.69216
3Filling foundation and around masonry work with moorum I/c ramming layers and watering.8.66145.41259.164
4Labour only for item no.040248035.817184
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.532343.83586.014
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)0.113400.4374.044
7Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)5.4185510017
8Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Flush pointing10.1359597.67
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 3998.413.553978.4
10Transportation of metal 659.4102.6967713.786
11Transportation of metal 1296139.86181258.56
12Transportation rates for Masonry stone.16702.426702.42
13Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.120223.5626827.2
14Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.360295.56106401.6
15Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN48032.815744
16Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-450mm dia22.5574.2512920.625
17Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.7.5347626070
18Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making2637.621.556708.4
19Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor12962329808
20Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work3998.481.2324670.08
21Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil11.9388.31053.419
22Collection of hard moorum including stacking at quarry.480130.862784
23Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete (i) 5th Kilometre Stone (precast) (ii) Ordinary Kilometer Stone (Precast) (iii) 200 m stone (precast)3.714286437.51625.000125
24SIGN BOARD135003500
25contingency132521.232521.2
26Labour difference in case of old SoR20014629200
Total Activity 1082000
S.NoMaterialQuantityUnit PriceTotal
12043 soil Compaction material14270042700
2Compaction of Selected soil12280022800
3Convergence Amount1176491176491
4PhotoCopy & Stationary150005000
5Transportanion of hard Muram1106401106401
6Transportanion of Soft Muram12600026000
7Transportation of embankment s1130190130190
8Transportation of Water12920029200
Total Material 539000