Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 05:58:26 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: KAITHA
Work Code: 1713004031/RC/780 (ग्रेवल मार्ग निर्माण अकलसी तालाब से अंगद के घर तरफ)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/1/2012 Work start date : 6/1/2012
Present status : Earthern road Proposed Status : Sand Moram
Tech Sanction Details
Technical Sanction No. : 780/31 Sanction Date : 6/1/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
225000 142000 0 0 0 0 0 142000 0 367000
Financial Sanction Details
Financial\Administrative Sanction No: 3/31 Financial\Administrative Sanction Date 6/1/2012
Fin. Sanc. Amt. (in Rs) NREGA:367000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
367000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works)45000.52250
2Dag-beling-Single spade stroke minimum 75mm deep15000.2300
3Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 2729.254.813100.4
4Transportation of metal 373.9582.5330862.0935
5Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.236.2518042525
6Korebandi for consolidation work.-30cm wide and 10cm thick.10001.91900
7Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN236.2564.215167.25
8Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia5777.43887
9Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor249317.443378.2
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work249367.8169025.4
11Collection of hard moorum including stacking at quarry.236.25109.325822.125
12SIGN BOARD115001500
13work charge531226466
14contingency11071110711
Total Activity 367000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work249317.443378.2
2contigency11071110711
3pipe ac5727.73638.5
4Rolling of Muram236.2539.69355.5
5sing bord1700700
6Soil transport49.59373.9518544.1805
7Transpotation of Mooram236.2518042525
8Trasportaion of water2729.254.813100.4
Total Material 142000