S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | 600 mm dia R.C.C. pipe | 15 | 1942.99133333333 | 29144.87 |
2 | Excavation in earth for all sorts of soil & silt, lime, shadu, sand/ grit, such types of strata including dressing and conveying the excavated material by head and upto a distance of 10m and laying or spreading or filling in furrahas in layers of 30cm thick upto lift of 1:50m as directed. (A) Excavation - (In General) Rate for the area | 1735.745 | 116.02499791156 | 201389.81 |
3 | Excavation in earth for soft murum type of strata including dressing and converying the excavated material by head load upto a distance of 10m and laying or spereading or filling in furrahas in layers of 30cm. Thick upto a lift of 1.50m as directed. (A) Excavation - (In General) rate for the othe area | 433.93 | 146.328002212338 | 63496.11 |
4 | Additional rate of additional lead by head load for all kind of soil, sand, soft murum, hard murum, stones, pebbles,boulders, rock. (Additional lead of 10 m. in other area) | 694.292 | 26.8632074112909 | 18650.91 |
5 | Additional rate of additional lead by head load for all kind of soil, sand, soft murum, hard murum, stones, pebbles,boulders, rock. (Additional lead of 20 m. in other area) | 216.964 | 49.6860308622629 | 10780.08 |
6 | Constucting casing or Hearting at embankment site with the following sorts of materials conveyed, removing trees, bushes, grass roots, etc. breaking clods and spreading the same in layers for embankement with earth work and dressing upto required level. (A) For Soil, soft murum and hard murum and boulder materials. For General area. | 1627.25 | 10.92 | 17769.57 |
7 | Cleaning the sides of land as directed and removing the roots up to 20 cm. circumference and disposing off all this material up to a 10m distance.
Rate for the other area | 1600 | 6.279 | 10046.4 |
8 | Supplying soft murum at the road site, including conveying and stacking complete. | 440 | 348.907954545455 | 153519.5 |
9 | Spreading hard murum/soft murum/gravel or kankar for side width complete. | 440 | 31.8339318181818 | 14006.93 |
10 | Compacting the subgrade /gravel/oversize metal (200mm loose) layers for all widths with vibratory roller having weight 8 to 10 MT including necessary, labour, materials and artificial watering etc complete. | 2200 | 42.46 | 93412 |
11 | Lum sum Material for all works. | 215425.9 | 1 | 215425.9 |