State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: GADHOTA(P)
Work Code: 1703004021/RC/22012034212265 (SUDUR SAMPARK SADAK NIRMAN (MITTI MURAM ROAD) naya)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2014 Work start date : 5/3/2014
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 3136/21 Sanction Date : 20/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
820121 624336 0 0 0 0 0 625000 0 1444457
Financial Sanction Details
Financial\Administrative Sanction No: 06/21 Financial\Administrative Sanction Date 20/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:1444457 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1445000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises12151.61944
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.81004.133210
3Contingency167890.2767890.27
4Dag-beling-Single spade stroke minimum 75mm deep200.24
5Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead638.5521.913984.245
6Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-1 coats1032.7327
7Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.261096.84252752.4
8Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.261041107010
9Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making2554.221.554915.3
10Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact261026.268382
11Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau405614.9249034.5
12Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:168.75441.474486.25
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work2554.281.2207401.04
14Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil208.7589.618704
15Collection of soft moorum including stacking at quarry.2610112.8294408
Total Activity 1445000
S.NoMaterialQuantityUnit PriceTotal
12048-Construction of gravel ba573.7526.215032.25
22049-Construction of gravel su573.75293.9168625.125
3Compaction of Earth Work2554.221.554915.3
4Compaction of Selected soil261026.268382
5contangency and work charges144629.9244629.92
6setting out work12000020000
7Transportanion of Soft Muram261096.84252752.4
Total Material 625000