S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 0 | 0 | 0 |
2 | Cutting down trees (exceeding 30cm girth, grubbing uproot, filling pits and levelling off ground, lopping branches, trimming, removing not exceeding 50meter & staking serviceable material and cleaning site.-Girth exceeding 100 cm and not exceeding 150 cm | 0 | 0 | 0 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 1 | 49000 | 49000 |