Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:30:20 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: GADHOTA(P)
Work Code: 1703004021/RC/22012034181153 (खरंजा निर्माण मैन रोड से प्रकाश के घर की ओर)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 16/4/2013 Work start date : 6/9/2013
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 21/225 Sanction Date : 17/6/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
335184 155704 0 0 0 0 0 156000 0 490888
Financial Sanction Details
Financial\Administrative Sanction No: 21/05 Financial\Administrative Sanction Date 20/7/2013
Fin. Sanc. Amt. (in Rs) NREGA:490888 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
491000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency124490.7224490.72
2Dag-beling-Single spade stroke minimum 75mm deep6000.2120
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.1200215.7258840
4Stacking without boxing.-Puddle earth, moorum, sand or kankar33310.53496.5
5Transportation rates for Masonry stone.180385.5669400.8
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.333172.2657362.58
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.3334113653
8Collection of hard moorum including stacking at quarry.333130.843556.4
9Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.156012.819968
Total Activity 491000
S.NoMaterialQuantityUnit PriceTotal
1contangency123940.6223940.62
2PhotoCopy & Stationary25041000
3sign board140004000
4खण्‍डा परिवहन180385.5669400.8
5मुरम परिवहन (1)333172.2657362.58
Total Material 156000