S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 23.92 | 95.6 | 2286.752 |
2 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 47.84 | 90.1 | 4310.384 |
3 | Stacking without boxing.-Puddle earth, moorum, sand or kankar | 47.84 | 29.5 | 1411.28 |
4 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 23.92 | 156.63 | 3746.5896 |
5 | Labour only for boulder soling hand packed excluding consolidation. | 47.84 | 115.6 | 5530.304 |
6 | Site clearance, cutting grass, raking into heaps and removing off the premises | 150 | 1.8 | 270 |
7 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 24.96 | 88.4 | 2206.464 |
8 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work | 6.24 | 117.7 | 734.448 |
9 | work charge | 1 | 66465 | 66465 |