State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: RONSARA
Work Code: 1711003/WC/22012035067014 (Const. of Stopdam Bakru Nadi Par Ronsra)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : BP
Execution Agency : Rural Engineering Services(04004) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 2/4/2023 Work start date : 12/5/2023
Present status : Non-existent Proposed Status : Constr of Masonry/CC Anicut for Community
Tech Sanction Details
Technical Sanction No. : 75/23 Sanction Date : 26/4/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
1066000 2423000 0 0 0 0 0 2423000 0 3489000
Financial Sanction Details
Financial\Administrative Sanction No: 1236/23 Financial\Administrative Sanction Date 5/5/2023
Fin. Sanc. Amt. (in Rs) NREGA:3489000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
3489000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard136823682
2Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)108.16335.8736327.6992
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)351.313855.971354640.8207
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)27.613202.6388424.6143
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size)636729.58423963.54
6False work for R.C.C. and P.C.C. work in plinth and foundation450.4174.2178464.184
7Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height45087.1739226.5
8Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars4231.3369.58294415.9414
922cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth.125215.9426992.5
10Transportation of metal 394.57414.75163647.9075
11Transportation of sand197.6784.8155076.48
12Transportation rates for Masonry stone.72.21213.9115446.4411
13Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.2.35213.91502.6885
14Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil5149.04156.79807317.9816
Total Activity 3489000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL166.321900316008
240 M.M. METAL28.0895026676
3CEMENT (BEGS)3191.563301053214.8
4False Work567.25174.2198820.6225
5pitching stone lead 20 km205215.9444267.7
6SAND (RATE)198.951400278530
7sign board136823682
8steel1134.1287.1798861.2404
9TRAINSPORT CHARGE107.52213.9122999.6032
10Transporation of Sand198.95784.8156135.96
11Transportation of metal194.4414.7580627.4
12Transportation of steel1134.12213.91242599.6092
Total Material 2423000