S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work excavation in pond(Dugout Pond, Mini Percolation Tank, Compost Pit ect.) Ring Bandh (Percolation Embankment, Earthen Gully Plug, Water Harvesting Structure, Silt Distention Dam etc.)/Pond/New Nalah/New Chennal etc. Retaining wall- (wet or dry soil), laying 15cm. layer breaking of clods and removing of Kankar and grass roots, dressing of earth work including compaction(with durmut) complete in all respect.
A.Ordinary Soil
1.5 meter vertical lift and 15 meter horizontal lead | 1.087 | 190.99356025759 | 207.61 |
2 | Plastering and Pointing - 12 mm thick cement plaster 1:6 on walls (HSR No. 15.7) | 10.098 | 128.785898197663 | 1300.48 |
3 | Painting Varnishing, White Washing & Distempering - Finishing walls with exterior decorative cement based paints such as snowcem, Robbiacem etc. on new work, two coats to give an even shade. (HSR No. 16.61) | 8.388 | 31.6165951359084 | 265.2 |
4 | Provision of Mate Under Semiskilled Labour | 2 | 414 | 828 |
5 | Social Forestry
-Plantation
-2. Fixing and alignment of 0.45 mt. long stick for plantation | 500 | 1.785 | 892.5 |
6 | Social Forestry-
Plantation-
4. Carry the plant bag from site to plantation site(5” X 9” size) | 500 | 1.071 | 535.5 |
7 | Social Forestry
- Plantation of tree in dig pit, fixing the stick and refilling the soil
- (2) Size 0.45 ´ 0.45 ´ 0.45 mtr. | 500 | 6.783 | 3391.5 |
8 | Social Forestry
- (3) Watering the collective plants(water is available more than 30 mtr. leed) | 500 | 9.996 | 4998 |
9 | Social Forestry- Digging holes for plantation size 0-45 ´ 0-45 ´ 0-45 mtr @ 0-30 ´ 0-30 ´ 0-30 mtr. including making berm around hole with excavated soil - (1) Odinary soil | 45.563 | 210.27302855387 | 9580.67 |
10 | Social Forestry - 1 Colletion loading and unloading of farm yard manure/garbage/solid waste into tractor trolley/ camel cart etc. by one labourer with 15 mtr. Lead. | 45.563 | 168.146961350218 | 7661.28 |
11 | Concrete Work - Cement concrete 1 : 8 : 16 with brick ballast 40 mm nminal size in foundation and plinth (HSR No. 10.30). | 1.087 | 3251.23275068997 | 3534.09 |
12 | Brick Work - First class brick work laid in cement sand mortar 1:5 in foundation and plinth (HSR No. 11.3) | 0.98 | 4589.14285714286 | 4497.36 |