S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 28.125 | 52.7 | 1482.1875 |
2 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 5.625 | 882 | 4961.25 |
3 | Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing. | 45 | 197 | 8865 |
4 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 33.75 | 1259 | 42491.25 |
5 | Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:8 (1cement, 8sand) | 24 | 1079 | 25896 |
6 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 300 | 59.1 | 17730 |
7 | Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Raised and cut pointing | 170 | 127 | 21590 |
8 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1 | 22162 | 22162 |
9 | contingency | 1 | 2022.31 | 2022.31 |