Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:31:23 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: NONKISARAI(P)
Work Code: 1703004039/RC/22012034298885 (KHARANJA NIRMAN RATI RAM KE MAKAN SE ASHOK SINGH KE MAKAN KI OR)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 23/10/2015 Work start date : 10/2/2016
Present status : Kharanja(Brick/Stone) Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 039/3585 Sanction Date : 24/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
218078 101006 0 0 0 0 0 102000 0 319084
Financial Sanction Details
Financial\Administrative Sanction No: 039/28 Financial\Administrative Sanction Date 30/11/2015
Fin. Sanc. Amt. (in Rs) NREGA:319084 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
320000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency116750.316750.3
2Dag-beling-Single spade stroke minimum 75mm deep4000.3120
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.720226.1162792
4Stacking without boxing.-Puddle earth, moorum, sand or kankar19511.52242.5
5Transportation rates for Masonry stone.108578.3462460.72
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.168200.8133736.08
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.16844.17408.8
8Collection of hard moorum including stacking at quarry.168140.723637.6
9Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.72013.89936
Total Activity 320000
S.NoMaterialQuantityUnit PriceTotal
1contangency and work charges14809.24809.2
2खण्‍डा परिवहन108578.3462460.72
3मुरम परिवहन (1)168200.8133736.08
Total Material 102000