S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Dense or hard soil | 97.14 | 71.7 | 6964.938 |
2 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Hard moorum | 291.39 | 80.6 | 23486.034 |
3 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 388.5 | 82.7 | 32128.95 |
4 | Collection of quarried stone or rubble.-Maximum size 0.014 cum | 310.8 | 120.3 | 37389.24 |
5 | Transportation of metal | 388.5 | 119.6 | 46464.6 |
6 | work charge | 30 | 100 | 3000 |