S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (I) Lead upto 100 Metres | 1147.49 | 38.8887223418069 | 44624.42 |
2 | (f) C.C 1:2.5:5 ( 1cement, 2.5 sand, 5metal) | 14.22 | 3541.2876230661 | 50357.11 |
3 | Centering and shuttering including strutting , propping etc. and removal of form work for P.C.C. work in foundation, footing, bases for column | 59.4 | 166.085353535354 | 9865.47 |
4 | (I) 0.5 Km. Lead -- | 2916.31 | 91.7115498695269 | 267459.31 |
5 | (IV) 2.0 Km. Lead | 47.43 | 113.817625975121 | 5398.37 |
6 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete. | 2916.31 | 17.4425455455696 | 50867.87 |
7 | (c) Metal 40 mm nominal size | 21.88 | 852.585009140768 | 18654.56 |
8 | (a) Boulders | 54.84 | 598.843544857768 | 32840.58 |
9 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 294 | 452.889795918367 | 133149.6 |
10 | (c) Hard moorum for Tank Work, lift of up to 3m depth | 252 | 169.83 | 42797.16 |
11 | Benching the seat of embankment to an average depth of 15cm and cross slope of 1 in 12 including cleaning of all foreign material, vegetation and other growth like grass and plant roots and removing the rubbish up to a suitable distance and dressing etc. complete. | 135 | 172.89 | 23340.15 |
12 | Site clearance, cutting grass, raking into heaps and removing off the premises | 2700 | 2.81891481481481 | 7611.07 |
13 | b (iii) Dense or hard soil for Tank Work | 968.82 | 144.074998451725 | 139582.74 |
14 | c (iii) Hard moorum for Tank Work | 1168.61 | 191.907899128024 | 224265.49 |
15 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 66.12 | 609.846339987901 | 40323.04 |
16 | (a) Dense or hard soil | 80 | 154.448375 | 12355.87 |
17 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 17.79 | 241.123664980326 | 4289.59 |
18 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 569.04 | 379.205398566006 | 215783.04 |
19 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 3682 | 3682 |