S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 76.75 | 74.5 | 5717.875 |
2 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 1 | 6035 | 6035 |
3 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 18 | 4253 | 76554 |
4 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 53 | 691 | 36623 |
5 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting) | 25.12 | 523 | 13137.76 |
6 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting) lift from 1.50 m. to 2.00 m. | 25.12 | 544 | 13665.28 |
7 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 2.00 m. to 2.50 m. | 25.12 | 566 | 14217.92 |
8 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 2.50 m. to 3.00 m. | 25.12 | 588 | 14770.56 |
9 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 3.00 m. to 3.50m. | 25.12 | 610 | 15323.2 |
10 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 3.50 m. to 4.00 m. | 23 | 632 | 14536 |
11 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 4.00 m. to 4.50 m. | 19.5 | 654 | 12753 |
12 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 4.50 m. to 5.00 m. | 19.5 | 676 | 13182 |
13 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 5.00 m. to 5.50 m. | 19.5 | 698 | 13611 |
14 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.00 m. to 6.50 m. | 18 | 699 | 12582 |
15 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.50 m. to 7.00 m. | 18 | 725 | 13050 |
16 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.00 m. to 7.50 m. | 18 | 752 | 13536 |
17 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.50m. to 8.00 m. | 11.87 | 779 | 9246.73 |
18 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.00 m. to 8.50 m. | 11.87 | 805 | 9555.35 |
19 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.50 m. to 9.00 m. | 11.87 | 832 | 9875.84 |
20 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting) lift from 9.00 m. to 9.50 m. | 11.87 | 859 | 10196.33 |
21 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 9.50 m. to 10.00 m. | 11.87 | 885 | 10504.95 |
22 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 10.00 m. to 10.50 m. | 11.87 | 912 | 10825.44 |
23 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.00 m. to 11.50 m. | 11.87 | 1048 | 12439.76 |
24 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.50 m. to 12.00 m. | 11.87 | 1014 | 12036.18 |
25 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.00 m. to 12.50 m. | 11 | 1082 | 11902 |
26 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.50 m. to 13.00 m. | 1 | 800 | 800 |
27 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 13.00 m. to 13.50 m | 11.87 | 1151 | 13662.37 |
28 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 13.50 m. to 14.00 m. | 11.87 | 1185 | 14065.95 |
29 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 14.00 m. to 14.50 m. | 11.87 | 1253 | 14873.11 |
30 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 14.50 m. to 15.00 m. | 11.87 | 1287 | 15276.69 |