State: MADHYA PRADESH District: KHARGONE Block: BHAGVANPURA Panchayat: KHAPAR JAMLI
Work Code: 1724008056/DP/22012034443413 (सार्वजनिक कूप /निर्मल नीर निर्माण कार्य पनालीमॉल फाल्या खापरजामली )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 22/12/2018 Work start date : 25/12/2018
Present status : Existing Proposed Status : Constr of Sand filter - openwell recharge for Comm
Tech Sanction Details
Technical Sanction No. : 4255/142193/61 Sanction Date : 28/12/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
245000 200000 0 0 0 0 0 200000 0 445000
Financial Sanction Details
Financial\Administrative Sanction No: 61, Financial\Administrative Sanction Date 29/12/2018
Fin. Sanc. Amt. (in Rs) NREGA:445000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
445000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m76.7574.55717.875
2Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used160356035
3Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)18425376554
4Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars5369136623
5Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)25.1252313137.76
6Earth work for well excavation-Disintegrated or soft rock (not requiting blasting) lift from 1.50 m. to 2.00 m.25.1254413665.28
7Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 2.00 m. to 2.50 m.25.1256614217.92
8Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 2.50 m. to 3.00 m.25.1258814770.56
9Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 3.00 m. to 3.50m.25.1261015323.2
10Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 3.50 m. to 4.00 m.2363214536
11Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 4.00 m. to 4.50 m.19.565412753
12Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 4.50 m. to 5.00 m.19.567613182
13Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 5.00 m. to 5.50 m.19.569813611
14Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.00 m. to 6.50 m.1869912582
15Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.50 m. to 7.00 m.1872513050
16Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.00 m. to 7.50 m.1875213536
17Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.50m. to 8.00 m.11.877799246.73
18Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.00 m. to 8.50 m.11.878059555.35
19Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.50 m. to 9.00 m.11.878329875.84
20Earth work for well excavation-Disintegrated or soft rock (not requiting blasting) lift from 9.00 m. to 9.50 m.11.8785910196.33
21Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 9.50 m. to 10.00 m.11.8788510504.95
22Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 10.00 m. to 10.50 m.11.8791210825.44
23Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.00 m. to 11.50 m.11.87104812439.76
24Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.50 m. to 12.00 m.11.87101412036.18
25Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.00 m. to 12.50 m.11108211902
26Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.50 m. to 13.00 m.1800800
27Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 13.00 m. to 13.50 m11.87115113662.37
28Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 13.50 m. to 14.00 m.11.87118514065.95
29Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 14.00 m. to 14.50 m.11.87125314873.11
30Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 14.50 m. to 15.00 m.11.87128715276.69
Total Activity 445000
S.NoMaterialQuantityUnit PriceTotal
120 MM Graded Metal12000020000
2Blasting Holas15000050000
3Cement12500025000
4Saria 112200022000
5sattring14700047000
6Transpotation Charges11500015000
7गिटटी110001000
8रेत12000020000
Total Material 200000