State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: PACHOR
Work Code: 1719006081/RC/22012034210930 (KHET SADAK NAHAR KI PULIYA SE BIJALI KE TAWAR TAK )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2014 Work start date : 28/2/2014
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 81/003 Sanction Date : 4/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
947000 466000 0 0 0 0 0 466000 0 1413000
Financial Sanction Details
Financial\Administrative Sanction No: 81/09 Financial\Administrative Sanction Date 6/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:1413000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1413000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises60001.69600
2Providing and fixing cut stone slab (chisel dressed) for roofs including flush pointing of the bottom in C.M. 1:3 (1cement, 3sand) and filling the joints in C.M. 1:4 (1cement, 4sand) including fixing in chased grooves in walls, curing etc. complete.0.937139.86640.014
3Transportation of metal 3537.550.67179245.125
4Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.60094.556700
5Loading of metal in truck, dumper etc.4137.526.28108733.5
6Unloading of metal in truck, dumper etc.4137.513.1454366.75
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.4137.541169637.5
8Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia20309.96198
9Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.153838.657579
10Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making124525.131249.5
11Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor29002778300
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work607.581.249329
13Collection of soft moorum including stacking at quarry.3537.5112.8399030
14Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete (i) 5th Kilometre Stone (precast) (ii) Ordinary Kilometer Stone (Precast) (iii) 200 m stone (precast)43341336
15Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete ) With Local Stone (i) 5th Kilometre Stone (ii) Ordinary Kilometer Stone (iii) 200 m stone26871374
16contingency11375013750
17Collection/Excavation of Gravel Material meeting the requirements of Hard moorum as detailed in RES SOR chapter No. 03 Notes Clause 3.2(C) including stacking and all leads and lifts up to the loading point at quarry.600130.878480
18Collection of river Borne material (RBM)(any mixture of sand & gravel)i/c boxing and all leads and lifts up to the loading point at quarry.600114.368580
19Rolling & Compaction of granule sub-base of well graded-material Spreading in unformed layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC and compacting with Smooth wheel rollers of 80 to 100 KN static weight to achieve the desired density, complete as pet Technical Specification Clause 401 of Specification for Rural Roads i/c all leads of water etc, complete.60061.536900
20BGSY logo board15933.75933.7
Total Activity 1413000
S.NoMaterialQuantityUnit PriceTotal
1BGSY Information Board in Ceme15933.75933.7
2Compaction of Earth Work124525.131249.5
3Compaction of Material50061.530750
4compaction of sub grad earthen29002778300
5contigency11090010900
6hume pipe20309.96198
7Kilometre Stone (200 M)43341336
8Kilometre Stone (ordinary)26871374
9pf RCC hume pipe 1000153838.657579
10Transportanion of hard Muram60094.556700
11Transportanion of Soft Muram3537.550.67179245.125
12अन्‍य कर्य203206400
Total Material 466000