S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 9000 | 1.1 | 9900 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 1713.2 | 55.6 | 95253.92 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum | 1144.8 | 66.9 | 76587.12 |
4 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 920.93 | 135 | 124325.55 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 22.5 | 1762.4 | 39654 |
6 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand) | 109.5 | 80.4 | 8803.8 |
7 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 950 | 9 | 8550 |
8 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 950 | 80.19 | 76180.5 |
9 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 950 | 44.1 | 41895 |
10 | Rolling & compacting of B.T. surface for Surface dressing coat or pre mix carpet or seal coat with power roller exceeding 8 tonne.-Including hire and running expenses of roller | 0 | 0 | 0 |
11 | work charge | 1 | 8850 | 8850 |