State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: MALUD
Work Code: 1725001028/WC/222 (पेय जल कुप निर्माण हनुमान मंदीर के सामने )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2011 Work start date : 18/5/2011
Present status : Existing Proposed Status : Check Dam
Tech Sanction Details
Technical Sanction No. : 0000159/11 Sanction Date : 16/5/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
150000 100000 0 0 0 0 0 100000 0 250000
Financial Sanction Details
Financial\Administrative Sanction No: 000007/11 Financial\Administrative Sanction Date 17/5/2011
Fin. Sanc. Amt. (in Rs) NREGA:250000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
250000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil43.1986.253725.1375
2Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Loose or soft soil22555.812555
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead140.6321.93079.797
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)7.6341825976.8
5False work for R.C.C. and P.C.C. work in plinth and foundation127154.219583.4
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars17865.911730.2
7Transportation of metal 6.46214.51385.67
8Transportation of metal 9.13193.051762.5465
9FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Black trap, basalt or granite13.5418.15644.35
10Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil27.1790.12448.017
11Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum27.17117.13181.607
12Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)84.34273.123033.254
13Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.248479.9119015.2
14Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)396.8312.65000.058
15work charge109.5610010956
Total Activity 250000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL.6.4610006460
2Blosting40010040000
3Cement4831014880
4Centring & Shuttering1279011430
5Display board125002500
6Mason Payment (Semi Skilled)123504200
7SAND (RATE)9.1310009130
8Saria 1178488544
9Transportation charges of mate128002800
Total Material 100000